Some update concerning Jibe 2 wind tunnel test project.
The preparation of the wind tunnel test by the two students in charge, Thomas & Sylvain, is still ongoing.
The wind tunnel cession will take place at S4 facility between the 10th & 14th of march 2008.
The airframe to be tested was just received from Flybiwo.
It must be prepared for receiving the inner measurement balance. Aileron & elevator will be installed, and their efficiency evaluated.